Ichalkaranji Municipal Council ( IMC )
Ichalkaranji Municipal Council (IMC), originally established in the year 1893 manages & implements all civic affairs in the corporation area. Ichalkaranji city is an industrial city having 40,000 properties out of which, 22,000 properties having the powerlooms as well as residence. It is the object of the IMC to provide basic facilities like road, water, drainage as well as ETPs, fire fighting, raw material bank, electrification for better industrial development of the city.

A. Improvement /Strenghtning of Road/Brides

1. Strengthening of Roads
1. Proposed strengthening of road in R. S. No. 556, 588A, 588B & 589 at Estate Area, Ichlkaranji. ( Length - 4.645 Km ) Rs. 1,09,13,505.00
2. Proposed development of roads in R.S. No. 470A, 751, 753 to 773, 781 to 785, 789 to 804 at Deshbhakta B. Khanjire Ind. Estate, Ichlkaranji. ( Length - 8.178 Km ) Rs. 2,50,53,018.00
3. Proposed strengthening of roads in R. S. No. 586, 587,602 & 604, at Estate Area, Ichlkaranji. ( Length - 2.507 Km ) Rs. 51,00,584.00
4. Proposed strengthening of roads from Chatrapati Shivaji Statue to Hulageshwari Chouk to Gujari Peth, Ichlkaranji. ( Length - 1.95 Km ) Rs. 57,84,691.00
5. Proposed strengthening of roads from Hulageshwari Chouk to Ch. Shahu Statue to Station Road , Ichlkaranji. ( Length - 2.50 Km ) Rs. 68,21,333.00
6. Proposed strengthening of roads from Nadi Naka to Zenda Chouk to Janata Bank to Ch. Shivaji Statue , Ichlkaranji. ( Length - 2.40 Km ) Rs. 65,94,174.00
7. Proposed strengthening of roads from Ch. Shivaji Statue to Kolhapur Naka, Ichlkaranji. ( Length - 1.80 Km ) Rs. 58,95,453.00
8. Proposed development of roads from Vikram Nagar Naka to Sangali Road, Ichlkaranji. ( Length - 1.20 Km ) Rs. 52,76,169.00
9. Proposed strengthening of roads from Sangali Road old Naka to Dr. Babasaheb Ambedakar Statue, Ichlkaranji. ( Length - 2.05 Km ) Rs. 55,92,543.00
10. Proposed strengthening of roads from Janata Bank to Warana Bank, Ichlkaranji.( Length - 0.70 Km ) Rs. 19,06,868.00
11. Proposed strengthening of roads from Site No. 95 to Kudache Mala to M.S.E.B Chouk Ring Road, Ichlkaranji.( Length - 2.30 Km ) Rs. 75,76,421.00
12. Proposed strengthening of roads from Nadi Naka to Uttam Chitra Mandir, Ichlkaranji. ( Length - 0.86 Km ) Rs. 23,43,568.00
13. Proposed development of roads from Sangali Road R.S. No. 672 to R.S.No. 610 Ring Road , Ichlkaranji. ( Length - 0.80 Km ) Rs. 50,78,763.00
14. Proposed strengthening of roads from Sangali Naka to Rajwada Chouk Main Road, Ichlkaranji. ( Length - 2.70 Km ) Rs. 80,78,955.00
15. Proposed strengthening of roads from Datta Process to India Society Main Road, Ichlkaranji. ( Length - 1.70 Km ) Rs. 46,37,831.00
16. Proposed strengthening of roads from Station Road Naka to jawahar Mashid Ggat No. 78 Main Road, Ichlkaranji. ( Length - 0.60Km ) Rs. 13,10,101.00
17. Proposed strengthening of roads from Ch. Shivaji Statue to Hatkanangle Naka, Ichlkaranji. ( Length - 2.70 Km ) Rs. 88,41,593.00
  Total Rs. 11,68,05,570.00

2. Bridge / Culvert Construction

1. Nala near Bohra Market 35.00 65.00
2. Nala near Vathare Mala 25.00

45.00

3. Nala near Gondkar Mala 45.00

45.00

  Total 105.00 155.00

 

3. Road Furniture
  Items Kms Cost
1. Road Divider concrete blocks 10.00

45.00

2. Sign board, Zebra Crossing, center strips painting etc.  

10.00

  Total 55.00
  Total (A+B+C)   1260.07
B. Water Supply Augmentation
      Cost
  Elevated Storage Tank   43.44
  Main pipe Line to storage Tank   74.95
  Water Pumping machinery   13.00
  Pipeline from Sto Tank to Khanjire Ind. Estate   26.10
  Water Distribution System   138.41
  Sub Total B 295.90
       
C. Electrification
  Items Nos. Cost
  Sodium Vapo Lmps+Poles+Cables etc. 192

42.83

  Sangli Road – Gonkar Timber – Lalnagar Chowk 28 7.08
  Shahu Statue – Vikramnagar – Sangli Road 134 33.30
  Sangli Octroi Post – Shahapur 61 15.57
  Sub Total C 415 98.48
       
D. Fire Brigade Centre
    Nos. Cost
  Vehicles 4

60.00

  Fire Station 2 24.00
  Water Tanks 2 16.00
  Sub Total D 415 100.00
       
E. Effluent Treatment Plant – 10 MLD
      Cost
  Equipments  

475.00

  Civil Works   790.00
  Pipeline Cost   95.00
  Transportation / Erection / Taxes / Octroi etc.   50.00
  Sub Total E   1410.00
       
F. Upgradation of Gutter/Drainage
      Cost
  RCC Gutter 32.17

225.80

  RCC Gutter for approach road 35.12 180.00
  Cross pipe 3.64 25.00
  Cross pipe for approach road 2.91 20.00
  Drainage work 5.05 250.00
  Sub Total F   700.80
       
G. Common Warehouse / Godown
    Build-up Area Cost
  Warehouse/Godown – Gr. Floor 2350

129.25

  Warehouse/Godown – 1 st Floor 1175 57.58
  Sub Total G   186.83
       
  Total (A+B+C+D+E+F+G)   4052.08
Ichalkaranji Muncipal Council
The Ichalkaranji Industrial co-operative Estate Ltd., Ichalkaranji
Laxmi Co-operative Industrial Estate
Parvati Co-operative Industrial Estate
D.K.T.E. Society's
   
     
© Copyright 2005. Ichalkaranji Textile Development Cluster Limited